| Head(m): | |
|---|---|
| Size: | |
| Flow (m³/h): | |
| Availability: | |
| Quantity: | |
CQB
Product Features
The wet parts of this pump are made of full stainless steel material to perform outstanding corrosion resistance to organic acid.organic compound, alk ali, neutral solution and a great many of gases,double helix carbon graphite bearing and hard alloy bearing are provided with good abrasion-resisting property to ensure the service life of product, it is an optimal pump for handling corrosive mediums without leakage.
Installation And Operation of Magnetic Pump
1. Magnetic pump should be horizontally installed, but not upright. Plastic pump is not able to endure the weight of pipeline. In case of special occasions requiring upright installation, motor should be kept upward.
2. When liquid level is higher than the centerline of pump, turn on the valve of intake pipe before start; when liquid level is lower than the centerline,a bottom valve should fitted to the pipeline.
3. Check before operation to make sure that motor rotates flexibly without jamming and abnormal sound, and that all fasteners are not loosened.
4. Check whether motor rotates in accor dance with the direction sign.
5. After motor is started, slowly turn on discharge valve. When pump enters normal working state, adjust the discharge valve to the required opening.
6. Before pump stops working, turn off discharge valve first, and then the valve of intake pipe.
Installation And Operation of Magnetic Pump
1. As the cooling and lubrication of magnetic pump's bearing depends on the medium to be handled, that's why unloaded operation is absolutely prohibited.Meanwhile, pay close attention to avoid the unloaded operation after re-start due to power cut in process.
2. If the mediums to be handled contain solid particles, then there should be a filter net at the entrance of pump. If there are ferom agnetic particles contained in mediums, a magnetic filter should be fitted (available in factory for your options).
3. The mediums to be handled, as well as their temperature, should be kept with in the allowed scope of pump material (please consult with relative technical department). The service temperature of engineering plastic pump should be<60℃, inlet pressure not greater than 0.lMPa, maximum working pressure at 0.6MPa;the service temperature of metal pump should be <100℃, inlet pressure not greater than 0.2MPa, maximum working pressure at 1.6MPa.
4.For mediums easily deposited or crystallized, please flush immediately after use to clear away the deposited liquid inside.
5. In case of any abnormal conditions (like large noise or violent vibration)occurred after long-time operation or during operation, disassemble the bearing and end-face rotating ring for examination of abrasion. If the clearance between bearing and axle sleeve is greater than 0.5-lmm, and axial crunkenness of impeller from 2-3mm, then the bearing and axial rotating ring should be replaced.


Performance Graph

Installation Dimensions


content is empty!